------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Notice:

Effective August 1, 2017 the role of Change Management Administrator (CMA) of the Local Number Portability Administration Working Group (LNPAWG) for all US Regions was transferred to Telcordia Technologies, Inc., d/b/a iconectiv.

To contact the iconectiv CMA or to be added/removed from the LNPAWG distribution list please email [email protected].

Please note that on or about September 30, 2017 the collection and history of industry documents will be transferred to https://numberportability.com/. Stay tuned for further updates at upcoming LNPAWG meetings and conference calls.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------

NANC Change Orders

The NANC Change Order section contains descriptions of the business functionality of the Number Portability Administration Center (NPAC) Service Management System (SMS) as defined by the Local Number Portability Administration Working Group (LNPA WG), which has a direct relationship to the processes and systems that each Service Provider uses to participate in LNP.

When a change in the NPAC software design is discussed at  the LNPA WG, the proposed change eventually is described in the form of a change order.  The change order document describes the business need for the software change and, at a high level, the software changes required to implement the proposal.  As discussions progress, the technical portion of the change order is expanded to document both new software requirements and changes to existing software requirements that would result if the Change Order were implemented.  (Operational impacts of a change order are described in "Method & Procedures" documents issued before the change order is implemented.)  In this section of the NPAC.com web site, all change orders ever considered are listed.  The final change order document and the LNPA WG discussion notes, the change order's status, and the identity of the software release in which the change order was implemented are provided here.

 The status of a change order may be either Closed, Open, Implemented, or Requested.  These terms are defined as follows:

  • Closed – The change order was considered and rejected.
  • Open – The change order has been considered and there may be further discussion.
  • Implemented – The change order was adopted and has been implemented in the NPAC system.
  • Requested – The LNPA WG has asked the NAPM LLC to arrange for the change order's implementation, but the change order is not yet implemented.

Change Order Summary sent to LNPA WG distribution --> Change Orders

Change Order Implemented List sent to LNPA WG distribution --> Implemented Change Orders

Change Order Prioritization Guidelines --> Guidelines Document

NANC Change Orders

Change Order Date Originated Description Status
NANC 487 08/12/2016 IIS/EFD Doc-Only Clarifications Implemented
NANC 486 08/12/2016 FRS Doc-Only Clarifications Implemented
NANC 485 06/08/2016 Turn-Up Test Plan Doc-Only Clarifications Implemented
NANC 484 03/10/2016 XML – Removal of Optional Data values Open
NANC 483 03/31/2016 FRS – Doc-only BDD Notification File Open
NANC 482 01/21/2016 Turn-Up Test Plan Doc-Only Clarifications Implemented
NANC 481 01/21/2016 GDMO Behavior Doc-Only Clarifications Open
NANC 480 01/21/2016 IIS/EFD Doc-Only Clarifications Implemented
NANC 479 01/21/2016 FRS Doc-Only Clarifications Implemented
NANC 478 09/03/2015 FRS ASN.1 – Pre Cancellation Status of Disconnect Pending Implemented/Open
NANC 477 09/03/2015 GDMO – Service Provider Type Definition Open
NANC 476 09/03/2015 Change Pool Block Error Requirements Implemented
NANC 475 09/03/2015 Change User Login Restriction Requirement Implemented
NANC 474 09/03/2015 ASN.1 – SWIM Recovery Open
NANC 473 09/03/2015 ASN.1 – AddressInformation Open
NANC 472 09/03/2015 ASN.1 – Audit Discrepancy Report Open
NANC 471 09/03/2015 ASN.1 – SV DisconnectReply Open
NANC 470 09/03/2015 Change SSL VPN Requirement Implemented
NANC 469 09/03/2015 Change Network Monitoring Requirement Implemented
NANC 468 09/03/2015 Phone Conversation Requirement Implemented
NANC 467 09/03/2015 ASN.1 – CMIP lnpRecoveryComplete Action reply Open
NANC 466 09/03/2015 Change Offline Batch Download File Requirement Implemented
NANC 465 07/10/2015 Turn-Up Test Plan Doc-Only Clarifications Implemented
NANC 464 07/10/2015 GDMO Behavior Doc-Only Clarifications Implemented
NANC 463 07/10/2015 IIS/EFD Doc-Only Clarifications Implemented