This NPAC SMS Software Release Implemented the Following Change Orders:
- NANC 169—Delta Download File Creation by Time Range for SV’s
- NANC 187—Linked Action Replies
- NANC 191—DPC/SSN Value Edits
- NANC 192—NPA Split Load File
- NANC 218—Conflict Timestamp Broadcast to SOA
- NANC 230—Donor SOA Port-to-Original of an Intra-SP Port
- NANC 249—Modification of Dates for a Disconnect Pending SV
- NANC 287—ASN.1 Change for Required Field in VersionNewNPA-NXX and VersionNewNPA-NXX Recovery Notification
- NANC 291—SSN Edits in the NPAC SMS
- NANC 297—Sending SV Problem During Recovery
- NANC 316—Change the NSAP Field Size Declaration in ASN.1-ASN.1 Recompile
- NANC 319—NPAC Edit to Ensure NPA-NXX of LRN is in Same LATA as NPA-NXX of Ported TN
- NANC 322—Clean Up of Failed SP List based on SP BDD Response File
- NANC 323—Partial Migration of a SPID via Mass Update
- NANC 354—Delta Download File Creation by Time Range for Network Data
Release 3.2 Related Documents:
-
Release 3.2 Turn-Up Test Plan (2004/02/12)
Download the document Release 3.2 Turn-Up Test Plan (2004/02/12)
-
Release 3.2 Project Plan (MS Word)
Download the document Release 3.2 Project Plan (MS Word)
-
Release 3.2 Project Plan (MS Project)
Download the document Release 3.2 Project Plan (MS Project)
-
Release 3.2 Project Plan (MS Project 1998)
Download the document Release 3.2 Project Plan (MS Project 1998)
-
Release 3.2 ITP Testing User MP (2005/03/08)
Download the document Release 3.2 ITP Testing User MP (2005/03/08)
-
Release 3.2 Interoperability Test Plan
Download the document Release 3.2 Interoperability Test Plan
-
Release 3.2 GDMO (2002/08/26)
Download the document Release 3.2 GDMO (2002/08/26)
-
Release 3.2 asn1 (2002/08/26)
Download the document Release 3.2 asn1 (2002/08/26)